PRISCILLA HOUSE — HARAPAN SUMBAWA PROJECT BUILDING REPORT

 

These are the details that were indicated in a previous newsletter of the starting point for the project .This stage has now been completed.

1. –Clean the building of trees and vegetation: The passage of time has provoked that several trees have grown inside the building. 2. –Change the frames of doors and windows: 3.- Change the damaged bricks and rebuild damaged walls. Several bricks and walls have been damaged affecting building security. Several steel beams need to be removed and rebuilt. 5.-Construction of the terrace of the building to be able to hold the roof that will be built in the future. 6-Digging and construction of a Septic tank.